Complete fire remediation of external facade.
City House, Croydon
City House is a 14-story apartment building on London Rd in the heart of Croydon. The façade consisted of flammable phenolic insulation cladded over with high pressure laminate panels, timber cladding and I-line profile at slab level. LCS was tasked with the complete removal of the existing façade to the bare SFS.
The bare structure was then water sealed with fire rated EPDM and mastic, this included all fixings, window reveals and sheathing board joints. The building was then reclad with new Tyvek breather membrane, Rockwool Duoslab insulation, Siderise fire barriers, Hilti stainless steel support framework with A2 rated Rockpanel cladding and Valcan Vitradual timber effect aluminium planks used to replicate wood and keep the existing building aesthetics.
Because of the building flat structure, mast climbers were used instead of scaffolding improving costs and reducing the time on site. The site was landscaped following the removal of the mast climbers and inspected at handover.
What LCS Provided
Fire Barriers
Staineless steel framework
Membrane
Insulation
Rockpanel
EPDM
Aluminium Planks
Mast Climbers
Valcan Vitradual
"I’ve worked with LCS extensively over the years on new builds and reclads and they are very good."
JAMES GROVES — Director of Assurance and Risk Management
5400m2
Rockpanel
7730m
Fire Barriers
14
Storeys
10
Mast Climbers
52
Duration (Weeks)